VArComp® XC1.5MVAr 33kV Capacitor Bank
- 19.12.2007
-
Project: Wind farm reactive compensation
Site Location: Houstry Wind Farm, Scottish Highlands
Equipment: VArComp® XC1.5MVAr 33kV capacitor bank (x2 pieces) - Hits: 159
-
VArComp® XC3.5MVAr 33kV Capacitor Bank
- 19.12.2007
-
Project: Wind farm reactive compensation
Site Location: Tangy Wind Farm, Argyll, Scotland
Equipment: VArComp® XC3.5MVAr 33kV capacitor bank - Hits: 137
-
5.35MVAr 11kV Generator Excitation Capacitor
- 20.08.2007
-
Project: Replacement capacitor bank
Location: Cleveland, UK
Equipment: 5.35MVAr 11kV generator excitation capacitor - Hits: 170
-
VArComp® XCL1.8MVAr 4.16kV Automatic Detuned Power Factor Correction Equipment
- 08.11.2007
-
Client: Rabigh Refining & Petrochemical Company
Site Location: Saudi Arabia
Equipment: VArComp® XCL1.8MVAr 4.16kV automatic detuned power factor correction equipment (x2 pieces) - Hits: 162
-
VArComp® 600kVAr (total) 415V Automatic Inductive Reactive Compensators
- 08.11.2007
-
Problem: Data storage facility running close to capacity required extra availability for increasing future load.
Investigation: Enspec Power Ltd were retained to conduct a load power survey. A poor leading power factor on the UPS output meant that extra kVA could be made readily available.
Solution: VArComp® 600kVAr (total) 415V automatic inductive reactive compensators were installed to improve UPS output power factor to ≈0.98 lagging. (300kVAr inductor bank pictured) - Hits: 158
-
VArComp® 800kVAr 11kV Capacitor Bank
- 20.08.2007
-
Activity: Nitrogen & oxygen generation systems
Site Location: Milford Haven, South Wales
Equipment: VArComp® 800kVAr 11kV Capacitor Bank
- Hits: 160
-
VArComp® 9.4MVAr 33kV 5th harmonic filter
- 20.08.2007
-
Client: 85MW generating aluminium smelting plant, Inverness-Shire, Scotland
Problem: Site exceeding G5/4 harmonic limits. Electricity supply company demanding compliance.
Investigation: Enspec Power Ltd were retained to conduct site harmonic survey and system modelling.
Solution: Installation of VArComp® 9.4MVAr 33kV 5th harmonic filter to reduce and maintain site harmonics to within G5/4 limits. - Hits: 159
-
VArComp® XCL-RT 1.62MVAr 380V 1-Ph
- 08.11.2007
-
Project: Al Ghazal Iron Works Welding flicker compensation
Site Location: Dubai, United Arab Emirates
Equipment: VArComp® XCL-RT 1.62MVAr (total) 380V 1-Ph real-time detuned power factor correction equipment (540kVAr real-time detuned capacitor bank pictured - 6x90kVAr stages) - Hits: 147
-
VArComp® XCL5.0MVAr 6.6kV Automatic Detuned Power Factor Correction Equipment
- 08.11.2007
-
Project: South Hook Liquefied Natural Gas (LNG) Terminal
Site Location: Milford Haven, South Wales
Equipment: VArComp® XCL5.0MVAr (total) 6.6kV automatic detuned power factor correction equipment (1.0MVAr detuned capacitor bank pictured - [2 x 250] + [1 x 500] kVAr auto stages) - Hits: 148