file icon VArComp® XC1.5MVAr 33kV Capacitor Bank
19.12.2007
Project: Wind farm reactive compensation

Site Location: Houstry Wind Farm, Scottish Highlands

Equipment: VArComp® XC1.5MVAr 33kV capacitor bank (x2 pieces)
Hits: 159
file icon VArComp® XC3.5MVAr 33kV Capacitor Bank
19.12.2007
Project: Wind farm reactive compensation

Site Location: Tangy Wind Farm, Argyll, Scotland

Equipment: VArComp® XC3.5MVAr 33kV capacitor bank
Hits: 137
file icon 5.35MVAr 11kV Generator Excitation Capacitor
20.08.2007
Project: Replacement capacitor bank

Location: Cleveland, UK

Equipment: 5.35MVAr 11kV generator excitation capacitor
Hits: 170
file icon VArComp® XCL1.8MVAr 4.16kV Automatic Detuned Power Factor Correction Equipment
08.11.2007
Client: Rabigh Refining & Petrochemical Company

Site Location: Saudi Arabia

Equipment: VArComp®  XCL1.8MVAr 4.16kV automatic detuned power factor correction equipment (x2 pieces)
Hits: 162
file icon VArComp® 600kVAr (total) 415V Automatic Inductive Reactive Compensators
08.11.2007
Problem: Data storage facility running close to capacity required extra availability for increasing future load.

Investigation: Enspec Power Ltd were retained to conduct a load power survey. A poor leading power factor on the UPS output meant that extra kVA could be made readily available.

Solution: VArComp® 600kVAr (total) 415V automatic inductive reactive compensators were installed to improve UPS output power factor to ≈0.98 lagging. (300kVAr inductor bank pictured)
Hits: 158
file icon VArComp® 800kVAr 11kV Capacitor Bank
20.08.2007

Activity: Nitrogen & oxygen generation systems

Site Location: Milford Haven, South Wales

Equipment: VArComp® 800kVAr 11kV Capacitor Bank

Hits: 160
file icon VArComp® 9.4MVAr 33kV 5th harmonic filter
20.08.2007
Client: 85MW generating aluminium smelting plant, Inverness-Shire, Scotland

Problem: Site exceeding G5/4 harmonic limits. Electricity supply company demanding compliance.

Investigation: Enspec Power Ltd were retained to conduct site harmonic survey and system modelling.

Solution: Installation of VArComp® 9.4MVAr 33kV 5th harmonic filter to reduce and maintain site harmonics to within G5/4 limits.
Hits: 159
file icon VArComp® XCL-RT 1.62MVAr 380V 1-Ph
08.11.2007
Project: Al Ghazal Iron Works Welding flicker compensation

Site Location: Dubai, United Arab Emirates

Equipment: VArComp® XCL-RT 1.62MVAr (total) 380V 1-Ph real-time detuned power factor correction equipment (540kVAr real-time detuned capacitor bank pictured - 6x90kVAr stages)
Hits: 147
file icon VArComp® XCL5.0MVAr 6.6kV Automatic Detuned Power Factor Correction Equipment
08.11.2007
Project: South Hook Liquefied Natural Gas (LNG) Terminal

Site Location: Milford Haven, South Wales

Equipment: VArComp® XCL5.0MVAr (total) 6.6kV automatic detuned power factor correction equipment (1.0MVAr detuned capacitor bank pictured - [2 x 250] + [1 x 500] kVAr auto stages)
Hits: 148
Company Member BWEA ISPA Power Logo UVDB Official UK Agents: ELSPEC Official UK Agents: VISHAY Embrace the Revolution logo
EPL Logo VArComp

...the name in reactive compensation & harmonic filtration

 

 

Enspec Power Ltd

17 Shaw Street
St. Helens
Merseyside
WA10 1DF
England

Tel: +44 (0) 845 057 1188

Glover Network Centre
Spire Road
Washington
Tyne & Wear
NE37 3HB
England

side-logos.gif

Company registered in England & Wales No. 4066153