<?xml version="1.0" encoding="UTF-8"?>
<!-- generator="wordpress/2.3.3" -->
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	>

<channel>
	<title>Enspec Power Blog &#187; Press Release</title>
	<link>http://www.enspecpower.com/blog</link>
	<description>Reactive Power Compensation and Harmonic Filtration</description>
	<pubDate>Wed, 21 May 2008 10:33:08 +0000</pubDate>
	<generator>http://wordpress.org/?v=2.3.3</generator>
	<language>en</language>
			<item>
		<title>Enspec Power Limited help windfarms connect to the Grid</title>
		<link>http://www.enspecpower.com/blog/2008/03/10/enspec-power-limited-help-windfarms-connect-to-the-grid/</link>
		<comments>http://www.enspecpower.com/blog/2008/03/10/enspec-power-limited-help-windfarms-connect-to-the-grid/#comments</comments>
		<pubDate>Mon, 10 Mar 2008 10:17:50 +0000</pubDate>
		<dc:creator>Neil</dc:creator>
		
		<category><![CDATA[Press Release]]></category>

		<category><![CDATA[Reactive Power Compensation]]></category>

		<guid isPermaLink="false">http://www.enspecpower.com/blog/2008/03/10/enspec-power-limited-help-windfarms-connect-to-the-grid/</guid>
		<description><![CDATA[Enspec Power Limited are gaining recognition in the Renewable Energy market by supplying VarComp® Reactive Compensation to Windfarms to comply with Grid Compliance issues.
Grid Compliance (The Grid Code) is a code laid down by the transmission system operator (eg. England, Scotland and Wales – NGET) requiring Power Stations to comply with certain standards to ensure [...]]]></description>
			<content:encoded><![CDATA[<p>Enspec Power Limited are gaining recognition in the Renewable Energy market by supplying VarComp® <a href="http://www.enspecpower.com/wind-farm-compensation.html" title="Reactive Compensation to Windfarms">Reactive Compensation to Windfarms</a> to comply with Grid Compliance issues.</p>
<p>Grid Compliance (The Grid Code) is a code laid down by the transmission system operator (eg. England, Scotland and Wales – NGET) requiring Power Stations to comply with certain standards to ensure a robust network is maintained.<br />
Enspec Power Limited have been assisting windfarm site owners, operators and systems manufacturers in the design, manufacture and supply of this vital equipment.</p>
<p>The majority of VarComp® systems supplied to date are at 33 KV but Enspec have the facilities and capabilities to provide any voltage required.</p>
<p>Windfarms require reactive compensation to operate from 0.95 leading to 0.95 lagging with the VArs maintainable under reduced loading. Reductions in VArs under part load start to apply below 50% MW load. The reactive compensation must also be capable of maintaining zero reactive transfer across all MW loads.</p>
<p>The nature of these site means that the Enspec VarComp® equipment is designed and built to withstand harsh environmental conditions and has a low maintenance profile.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.enspecpower.com/blog/2008/03/10/enspec-power-limited-help-windfarms-connect-to-the-grid/feed/</wfw:commentRss>
		</item>
	</channel>
</rss>
